What to Expect from a Full Kitchen Remodel: Steps and Costs
Thinking about a full kitchen remodel? You’re not alone. Whether your goal is to update outdated finishes, improve layout efficiency, or finally get that dream island, remodeling your kitchen is one of the most rewarding yet complex home upgrades you can take on.
At Build Strong Construction & Remodeling in Irving, TX, we’ve helped many homeowners transform their kitchens from dated and dysfunctional to modern, stylish, and practical. So if you’re wondering what’s really involved in a kitchen remodel—how much it costs, what steps to expect, and how long it might take—you’re in the right place.
Let’s walk through the entire process together.
Why Consider a Full Kitchen Remodel?
A kitchen remodel isn’t just about aesthetics. It’s about function, flow, and creating a space that works for your lifestyle.
Here’s why many homeowners decide it’s time for a full update:
- Outdated layout – Poor storage, bad traffic flow, and lack of prep areas.
- Old appliances and materials – Energy-inefficient or worn-out features.
- Need for more space – Desire to open up the kitchen or expand it.
- Increased resale value – Kitchens are a major selling point for home buyers.
- Making it your own – A new home may have a kitchen that simply isn’t your style.
Kitchen Remodel vs. Partial Renovation: What’s the Difference?
Before we dive in, here’s an important distinction:
- Partial renovation: Updating just a few elements (e.g., painting cabinets, replacing countertops, or buying new appliances).
- Full remodel: Gutting all or most of the kitchen—cabinets, flooring, walls, plumbing, electrical—and rebuilding it.
This guide focuses on full kitchen remodels since they require much more planning, budget, and coordination.
The Step-by-Step Process of a Full Kitchen Remodel
A full kitchen remodel typically follows a clear set of stages. Here’s a look at each, so you know exactly what to expect.
1. Initial Planning and Vision
Start by asking: What do I want from my new kitchen?
- Make a list of needs and wants
- Collect inspiration photos and design ideas
- Determine how you use your kitchen (daily meals, entertaining, etc.)
This is the stage where you’ll want to consult a professional remodeler. At Build Strong Construction & Remodeling, we help homeowners clarify their vision, prioritize needs, and suggest creative solutions based on space and budget.
2. Budgeting and Setting Expectations
Costs can vary hugely based on your choices. It’s smart to start with a reasonable budget.
Typical Full Kitchen Remodel Costs in Irving, TX:
|
Remodel Type |
Approximate Cost Range
|
|---|---|
|
Low-end Remodel |
$15,000 – $25,000 |
|
Mid-range Remodel |
$25,000 – $50,000 |
|
High-end Remodel |
$50,000 – $100,000+ |
Factors that influence cost include:
- Size of your kitchen
- Quality of materials (cabinets, counters, appliances)
- Structural changes (removing walls, relocating plumbing)
- Labor and design services
Tip: Set aside 10–20% of your budget for unexpected costs (they happen!).
3. Design and Floor Plan Development
Once you’ve defined your goals and budget, the design phase begins.
This includes:
- Creating a floor plan (with or without structural changes)
- Selecting cabinetry style, finishes, and colors
- Choosing flooring, lighting, backsplash, appliances, and fixtures
Good design ensures your kitchen looks great and functions effortlessly.
4. Permits and Preparation
In Texas, some remodeling work requires a permit, especially if you’re relocating plumbing or electrical systems.
- Your contractor should handle the permit process
- Pre-work inspections may be required
- Prep may include clearing out the kitchen and setting up a temporary cooking area
5. Demolition
Now the real fun begins.
- Removal of old cabinets, countertops, backsplash, and sometimes flooring
- Disposal of outdated appliances and fixtures
- Possible opening up of walls for new plumbing or wiring
This stage usually takes a few days, depending on the size of the kitchen.
6. Structural Work (If Needed)
This includes:
- Moving walls or opening the space
- Updating wall supports (especially in older homes)
If you’re reconfiguring the layout extensively, this step is crucial and may extend the timeline.
7. Rough-In Work: Plumbing, Electrical, and HVAC
Licensed professionals will:
- Route new plumbing lines for sinks, dishwashers, refrigerators
- Install updated wiring, outlets, and lighting
- Adjust HVAC vents if layout changes affect circulation
This is another area where a seasoned remodeler like Build Strong ensures local code compliance and safety.
8. Drywall, Painting, and Flooring
After utilities are installed and inspected:
- Drywall is patched or fully replaced
- Walls are painted
- Flooring is installed (tile, engineered wood, vinyl plank—your choice!)
9. Cabinet and Countertop Installation
Once the room is structurally and mechanically ready:
- Cabinets are installed first with careful leveling
- Countertops are measured and templated (usually takes 1–2 weeks to fabricate)
- Once countertop arrives, it’s securely installed
10. Backsplash and Lighting
Next come the final design layers:
- Tiled backsplash adds elegance and protects walls
- Light fixtures are installed—under-cabinet, ceiling, and task lighting
11. Appliance Installation and Final Plumbing/Electric Hookups
You’re in the home stretch now:
- Stove, fridge, dishwasher, and microwave are installed
- Sinks and faucets are connected
- Electrical connections are finalized for appliances and lighting
12. Final Touches and Walkthrough
Your remodeler will:
- Complete final inspections
- Touch up paint or caulking
- Walk through the remodel with you
- Make note of any fixes or punchlist items
How Long Does a Kitchen Remodel Take?
Here’s a rough timeline based on average projects in the Dallas-Fort Worth area:
|
Remodel Stage |
Estimated Time
|
|---|---|
|
Design + Planning |
2–4 weeks |
|
Permitting + Prep |
1–2 weeks |
|
Construction + Installation |
6–10 weeks |
|
Total Time |
8–14 weeks on average |
Note: More complex remodels or delays in material shipping can stretch this timeline.
Hidden Costs to Watch For
Even with good planning, surprises can happen.
Watch for:
- Hidden damage (like mold behind old cabinets)
- Upgrades triggered by code (older homes may need panel updates)
- Delays in material delivery
- Temporary kitchen setup costs (eating out, portable cookers, etc.)
At Build Strong, we always aim to be transparent and prepare homeowners for these situations, so you’re never caught off guard.
FAQs About Full Kitchen Remodels
What’s the ROI on a kitchen remodel?
In Texas, a mid-range kitchen remodel can recoup around 60–70% of its cost when selling your home, sometimes more in a hot market.
Can I live in my home during a kitchen remodel?
Yes, but it’s not always comfortable. Many homeowners set up a mini kitchen in another room and limit remodeling to weekday hours.
Should I hire a general contractor?
Absolutely. A kitchen remodel involves coordinating plumbers, electricians, cabinet installers, etc. A reputable contractor like Build Strong manages the full process, ensuring quality and timeline control.
Is it better to do everything at once or in phases?
Doing a full remodel at once saves time, money, and stress in the long run. Phased remodeling can lead to higher costs and design mismatch down the road.
Ready to Remodel Your Kitchen in Irving, TX?
Remodeling your kitchen is a big investment—of time, energy, and money. But when done right, it transforms the heart of your home into a space that’s both beautiful and functional. At Build Strong Construction & Remodeling, we believe great remodeling starts with trust, clear planning, and skilled craftsmanship.
If you’re thinking about a full kitchen remodel in Irving or the surrounding DFW area, let’s chat about your vision.
- Explore our services
- Request a free consultation
- Or follow our blog for more remodeling tips
Let’s build something strong together.